Add to favorites
MAD OWL 4-Pin Waterproof LED Wire Connector Kit, 16 AWG 11inch/28cm Male Female Connectors with Tin Plated Joint for Various Waterproof Wires DIY (4 Set Black) by MAD OWL - Used condition

MAD OWL 4-Pin Waterproof LED Wire Connector Kit, 16 AWG 11inch/28cm Male Female Connectors with Tin Plated Joint for Various Waterproof Wires DIY (4 Set Black) — Open-Box, 15% Off

Brand: MAD OWL

Condition: Used - VeryGood
$1528
$1798
-15% Save $270
Updated: 64 days ago

Description

CONNECTOR TYPE: 4-Pin waterproof LED wire connector kit with male and female connectors designed for various waterproof wire applications

WIRE SPECS: 16 AWG wire with 11-inch/28cm length and tin-plated joints ensures reliable conductivity and durability in various applications

WATERPROOF DESIGN: Heavy-duty moisture-resistant construction protects connections from water and environmental elements in outdoor settings

VERSATILE USE: Perfect for DIY projects, LED lighting systems, rock lights, outdoor lighting systems, and various low-voltage electrical projects requiring connectivity

EASY INSTALLATION: Standardized 16 AWG wire gauge and straightforward 4-pin design enables simple setup while maintaining secure connections

Discover the MAD OWL 4-Pin Waterproof LED Wire Connector Kit, a versatile solution for your electrical connection needs. This professional-grade kit includes 4 sets of black male and female connectors, each featuring 16 AWG wire with an 11-inch (28cm) length. The connectors are enhanced with tin-plated joints for superior conductivity and durability. Perfect for various waterproof wiring applications, these connectors are ideal for LED lights, rock lights, outdoor lighting systems, and other DIY electrical projects requiring reliable, water-resistant connections. The 4-pin design ensures straightforward installation while maintaining a secure connection in challenging environments. Whether you're working on automotive lighting, outdoor fixtures, or custom LED installations, these connectors provide the reliability and protection your project demands. The standardized 16 AWG wire gauge makes these connectors compatible with many common LED and low-voltage applications.

Sold by

Amazon Warehouse

Verified Retailer

Official Amazon outlet for open-box & returned items

  • Backed by Amazon's A-to-Z Guarantee
  • 30-day return policy
  • Ships from Amazon fulfillment centers
  • Price verified on Amazon

Product Details

SKU:
awhd-us-b0f6lr3gwp
Model:
B0F6LR3GWP
Country:
US
ASIN:
B0F6LR3GWP

Shopping Smarter

Common questions about buying open-box and refurbished.

Why buy refurbished or open-box?
Refurbished and open-box products offer the same performance as new at a fraction of the price. You're already saving $3 on this listing. They've been inspected, tested, and are ready to use — the only difference is the price tag. Buying refurbished also reduces electronic waste, extending product life cycles and keeping functional devices out of landfills.
What's the difference between open-box and refurbished?
Open-box products are customer returns that have been inspected and confirmed functional. They may show little to no use — often the item was returned simply because the buyer changed their mind. Refurbished products have been professionally repaired or restored by technicians, tested to meet or exceed manufacturer specifications, and sometimes come with a warranty. Both are a smart alternative to buying new.
Why use OpenBoxFox?
Finding refurbished deals is time-consuming — you'd have to check Amazon Warehouse, Reebelo, Dyson Outlet, and others separately for MAD OWL products. OpenBoxFox aggregates these listings in one place, so you can compare and find the best deal without the legwork. We update pricing daily so you always see current availability and real savings.
Is it safe to buy refurbished?
Yes. Products listed on OpenBoxFox come from established retailers like Amazon, Reebelo, and Dyson — not unknown third-party sellers. Each retailer has buyer protection policies, return windows, and in some cases warranties. You get the price advantage of used goods with the purchase security of a known retailer.

More open-box deals

Updated daily from Amazon, Reebelo, and Dyson.

Sign in to save items

Save favorites and get alerts when prices drop.

or

We'll email you a link to sign in instantly — no password needed.